NSW Emergency Backstop Mechanism
The NSW Government’s Emergency Backstop Mechanism is set to commence in late-2026.
The NSW Government’s Emergency Backstop Mechanism is set to commence in late-2026. It is a last resort safety measure, required by the Australian Energy Market Operator, to protect the electricity grid during rare emergency conditions.
Protecting the grid from Minimum System Load
In response to advice from the Australian Energy Market Operator, the NSW Government will shortly amend Endeavour Energy's operating licence conditions to introduce the NSW Emergency Backstop Mechanism.
The NSW Emergency Backstop Mechanism is a last resort response to keep the power system secure under emergency conditions, known as Minimum System Load events. It will only be actioned to keep the lights on if nothing else is working. An emergency backstop is expected to be a rare event.
Download Endeavour Energy fact sheet: Supporting Rooftop Solar in NSW to find out more about how Endeavour Energy is partnering with the NSW Government to support rooftop solar in NSW.
Systems that need to be emergency backstop enabled
The NSW Emergency Backstop Mechanism requirements will be phased in from November 2026, in parallel with the launch of the NSW Government’s Consumer Energy Resources (CER) Installer Portal, through which all new and upgrading solar systems up to 200 kW will be registered and commissioned.
Endeavour Energy has updated its Permission to Connect for solar installations to manage the phased transition of incoming requirements. Solar installers are responsible for installing rooftop solar systems in accordance with our updated Network Standard for the connection of Inverter Energy Systems, NS194, the approved Connection Contract and the Schedule of Site-Specific Conditions, which include:
This incoming initiative will require installers to:
- Installing equipment that is compliant with the Australian Standard ‘Common Smart Inverter Profile – Australia’ (CSIP-AUS).
- Conducting a short capability test at the time of installation, confirming connectivity to Endeavour Energy’s utility server via the internet. The test is conducted using the NSW CER Installer Portal.
These requirements will not apply to existing rooftop solar systems. Exemptions will also apply to embedded network customers or those seeking a like-for like replacement (e.g. under a manufacturer’s warranty).
Where a premises lacks reliable internet connectivity, the new equipment must still be CSIP-AUS compliant. However, a low static export limit of 1.5kW per site must be configured by the installer at the time of installation, which will apply until connectivity is available.
Solar retailers, installers and customers are advised that Emergency Backstop requirements are being phased in by postcode across NSW from November 2026.
Please use the postcode checker below to see when new requirements apply in your area.
Solar/battery systems connecting to the Endeavour Energy network
Phased in by postcode, installers use the CER Installer Portal to conduct a capability test during installation confirming complying sites are backstop enabled
All new and upgrading solar systems are registered in the CER Installer Portal and are backstop-enabled
Any system approved before 2 November 2026 that has not been commissioned will need to reapply to connect, be registered in the CER Installer Portal and comply with emergency backstop requirements
Preparing industry for these changes
Endeavour Energy recognises these initiatives represent significant changes to the way CER is installed in NSW. We are committed to working closely with the NSW Government and other NSW distribution networks to provide industry with appropriate information and training opportunities before these requirements are introduced in late-2026.
The NSW Government and Clean Energy Council, in collaboration with NSW distribution networks, have prepared a short online training course outlining the challenges facing our grid and about these incoming obligations. Industry professionals can earn 20 Continuing Professional Development (CPD) points for completing the course. You can access this training for free through the Clean Energy Council website.
You are also able to complete the NSW Emergency Backstop course through Solar Accreditation Australia for additional 20 Continuing Professional Development (CPD) points. Members can access this training for free through the Solar Accreditation Australia website.
Further information, training and resources will be made available progressively throughout 2026.